SOUNDPROOFING CONTRACT
Agreement No.: ____________________
Client: ____________________Contractor: ____________________
Address: __________________Address: ______________________
Telephone: ________________Telephone: ____________________
- Scope and price. The contractor will fabricate and install the agreed soundproof window system according to the confirmed drawings and quotation.
- Payment schedule. A 40% fabrication deposit is due upon signing, 30% before delivery, and the remaining 30% after inspection and acceptance.
- Specifications. Profiles, glass configuration, hardware, opening method and finish follow the attached project schedule.
- Delivery and installation. Production normally takes 15–20 days, followed by local installation. The parties will confirm the installation date and site access arrangements in advance.
- Inspection. Product condition, operation, sealing and workmanship will be checked jointly after installation.
- Decibel commitment. Pre-installation and post-installation readings will be recorded using the agreed measurement method. The written indoor target is used for acceptance.
- Warranty and service. A three-year product warranty applies after installation, with lifetime maintenance support available.
Client signature
Contractor signature